Thursday, May 31, 2012

Stained Glass Windows

I came up with an idea to get all the stained glass windows in the castle done and have others do the work, have a party!  So, on Memorial Day, we invited the some friends and family over, gave them drinks and food and let them design a window that will be a permanent part of the castle. Here is what they came up with.



Andy and Rex built frames for the windows that people would simple place the glass in. Here are the framse set up and ready for people to get to work. Andy has some of his big pieces of glass that broke on the corners cut into diamonds and triangles and then tumbled them so the edges weren't too sharp.

We laid out all the pieces for people to choose from and let them put them anywhere, they wanted within a structural capability. Andy did give a lesson or too on certain rules, I never listened to know what they were except they had to lay the first few rows horizontally fr structural reasons.










As the lessons went on and Andy supervised everyone was getting the idea, I just drank my summer cocktail and took pictures.









The Aspengard's took part early on and finished with a nice design 




The Pirro girls took part and took it serious, Jess wasn't happy with the design at first, but she came around! 



Jack wasn't liking Aunt Ann's and Julie's, but it is hard to please Jack.

                             
The Nye girls took control and combed out colors early on to get this nice design.

 Ms. Bev took a smaller, pool room window and came up with a nice pool room design, Pat handed her the glass she asked for.Nice tea work! 


The Baldwin's have a nice X pattern going on here!  
                                                                 


The Danaher's  had a similar X pattern with a fly off variation, very nice


The Glowacki's were missing Helen and Phoebe, but did their best without them. the G's were going for a ting yang in the middle, but I kinda see a G now.

The Corona girls, I swear I got their picture, but they were working so hard on the Corona sun while their parents drank that I never got their picture.
 
Not that I am bias or anything, but I think Rex did the best with his window after watching everyone else. It'll be in the fungeon!  Legos paid off with him and his design!


So those are our new windows for the castle. Sorry if I mixed them up on the blog. There will be plaques next to them at the castle to denote the family who created them


Tuesday, May 15, 2012

Antique Road Trip to Tupper


We took a road trip to Saratoga to reclaim some old chairs and found some other treasures along the way.  These new lions are ours! (Rex & Ruby) and they will great you on your way down the driveway when we get a big heavy truck to go pick them up! . This fountain, also ours. Andy is thinking of putting it on face of front of castle to deter people from leaning against the stucco. We got lots of other trickets along the way too, but I don't know what Andy has done with them all. We found a great bookstore and got a bunch of books for the library, all very medevil!                                                                                                                             











Here is the trailer with the chairs and a church pew we got, we look like the Tupper Lake hillbillies!   


We also found these chairs in Watertown on the way home, a set of four that we will castle down a bit.
                   
I know people were worried about me travelling, so I rested when I could.






So, We took the back back way from Saratoga to Tupper and found a great Monument in Newcomb! It is a glass range of the high peaks and it kinda lines up with them, the boys were trying to be their own High Peak!




Work has been going on with Brian and Mark there, even though we haven't been doing much.  Andy is still doing as much planning, preparing, and fabrication as he can from home and he is so good about keeping it all on line and on track for completion.
Anyways, we didn't plan on working a lot this weekend, just clean up, meet with workers and make sure everyone is on the same page.

Brian and Mark are:
1. preparing the walls on the fourth floor for bathrooms and bedrooms.
2. They are also working on the raised floors as we will be laying In floor heating tubes soon.
3. they are also working on finishing the cuts in the concrete block in the kitchen, in the dungeon, and the hallway to the new bedrooms.
4. They will also be trimming the exteriors of the two large bay windows in the great hall.
5. They are finishing the queens' s balcony floor.
6. Trimming out interior of windows.
7. They are installing the final pieces of the waterproofing on exterior of turret in preparation for mason to start.
8, A few issues with the Mason, didn't start when suppose to last fall, didn't start in April, and now still hasn't started. Any Mason who wants to work, let us know, we are in need of a new one. to [put              block on turret. Already have the block, just need timely worker!







Andy and Rex inspecting the Queens Balcony and build out to second floor.







Build our for kitchen. This is one of the concrete walls the boys will be cutting.








Rex looking out on 2nd floor platform


                               looking up at the ceiling/2nd floor with all my glorious stenciling






 The two big opening are left to hoist big furniture
up through onto top floors.


Looking down from 2nd floor, it is so weird to have a 2nd floor there now! 


and the turrert waiting for a reliable Mason! 

An old friend, Greg Ruppert, I use to babysit his children, is going to work on spray foam insulation on the interior of the roof, and the interior of the turret as it has been condensating.  Greg is also going to hit the interior of the doors with the spray foam.  Basically, he is going to hit all the stuff I gapped and cracked last fall for permanency of insulation.

Patti came with her mom and daughters on the way to their mother's day celebration. She was very excited to walk on the new floor and to see the big holes in the ceiling where the big furniture will be going up.

Walked property with Rex. It was set and muddy, but all the ponds are doing well and holding their water well. Lower pond first picture. Upper Pond second picture


Thank you to maggie & Jerry at the park motel for my antioxidant gift basket . Loved everything in it.

Andy headed up again on his own on Friday June 8th & 9th is anyone wants to go work some.

Wednesday, April 25, 2012

April 14th

So, I apologize for not being a better blogger on the castle, but as many of you know, I was diagnosed with a re-occurance of breast cancer on 3.22.12. I have had two surgeries since and been diagnosed  with re-occurance of the previous DCIS cancer as well as Invasive Carcinoma stage two. I just started chemotherapy for 16 weeks and will have 8 weeks radiation after that, so not a lot of castle work for me this summer, but I hope to be up there relaxing, cause what better place to do it. The new blog for this chapter of our life is (Ramsard102.blogspot.com, yes I forgot the g in our name so make sure you do to when you are pluggin it in )
I am pushing for Andy and the kids and friends to get up there as much as possible, but at least we have Brain and Marc still plugging away.
Andy, Dave, & Maria (three timers now) met Brian and Marc up there over April break. They are working on the Queens Balcony near the big window in the great room. Here is Andy painting  some of the carving they did. The carvings are dragons! 



 Here are Maria and Dave doing their dragon carvings. Andy told Brian and Marc master carvers were coming up to do this. Once here they learned Dave is a Writer and Yoga teacher and Maria is the Mistress of all that is good, they are a positive, healing force in our lives right now for sure and grateful for both of these special people!




Toshie is never far from the action.Looks like he found a nice place right next to Dave and in the sun

Up close and personal with the dragon.













.You can see them hanging the dragon pieces into place where the balcony will be here.

The most exciting part that I saved for last is that the ceiling in the great room, and the floor to the 2nd floor is up and here it is! The hole against the wall is where they will bring though all the large furniture and kitchen pieces.

Stay tuned. We have no trips planned for May due to treatments and Boyscouts activities, but hope to be getting up there in June. Will try and get Brian and Marc to send pictures of their continued work. Talked with some Lake Placid friends too and it seems a party is in the making for June so you can all see me bald!  Will keep you posted on that!

Wednesday, March 28, 2012

Another Boys Weekend

So Andy and Rex were back to work this weekend at the castle. Brian and Mark continue to work also, so lots has been getting done. Here you can see the big stencil beams and the smaller stencil beams are almost all up, this is the ceiling to the great room.

This is looking down from 2nd floor, through ceiling into great room. You can see how they are starting to extend new second floor over the top of the ceiling.

This is the framing in of the area above the great room stairs. The small powder room off the library is behind this wall. You can see Rex holding up a piece of art work Andy found at an antique store that will go right there perfectly.


This is one of the new windows Andy cut way up high in the great room for a fourth floor bedroom, now the window is getting a floor to go with it.



More framing in. I believe this is the kitchen area extending into the great room.


A couple weekends off for Easter, but we will be back the weekend after.


Have a good Holiday!












Monday, March 12, 2012

Five Guys & the story of the Beams & Brackets

As the Five Guys left Sunday afternoon after a long hard weekend of castle building, alittle bit of partying on the side, this is what they saw. The sunlight floating through the new windows and dancing on the new beams and brackets


It all started last Monday...
I mentioned in passing that my cousin's husband, Brian Reed, was helping us with the castle when we are up. Well now, he and his friend, Marc Segabache, are working during the week when we are not there and that means things are moving along even quicker than we hoped for.
Last week Brian and Marc :
* finished trimming the rest of the windows on the exterior that we installed the previous weekend.
* knocked out concrete plugs in floor, that Andy had started last year, in preparation for electrical, mechanical, and plumbing to be installed.
* framed library wall out so we could put installation in before we slide the library built-ins in.
* framed portion of third floor, where kitchen wall is being knocked out & steel beam was installed in November, in preparation for timber framing to be placed in great room that will be floor for 4th floor.


Downside to them working during the week and me not going up last weekend is I have no pictures of any of this, but I will take them next visit, so if it is hard to visualize, stay tuned.


Last weekend, the kids & I stayed home due to activities they had planned and Andy headed up with our friend, Tom Corona, of NCI Home Inc. & his friend David Blair, of David Blair Contracting, to work with Brian & Marc, to install brackets & timber frames.

If you remember, Dennis, Rex, & Andy installed the brackets on the east wall last summer. We had to do those then as they were bolted in from the outside and needed to be done before the stucco went on. Well, now it was time to get the brackets on the west wall up, so we could get the timber frames up, so we can start building the ceiling to great room/ floor to 4th floor.
Well the boys worked hard and got all 6 brackets up and all 7 timber frames in place. There are the 350 lb. timber frames that were delivered from California last year and stenciled throughout the summer.

As Andy tells it, the process started with trimming each beam to the exact length. He noted as good as Edward & his friends were as masons, they were still off plum and not square by 3 inches. Seems close enough to me, but Andy said, "as rustic as the beams look, they have a high level of precision that has to be maintained when installing them."



Once trimmed, one at a time, the timbers were hoisted into the air with a chain fall ( on loan from our friends at Leo's Body Shop). Once in place and precise, they were bolted into the brackets. Once secure, the chain fall is dismantled, the beam dolly is moved and re-set for the next timber. All this is being done by five guys just having a good time! five beams on Saturday, two on Sunday. These are the only pictures Andy got for us.


Thanks to Tom & David. Much thanks to Brian & Marc for taking on the task of weekday work, love coming up and seeing so much progress, you guys are awesome!

We are off this weekend, Andy & Rex are headed to DC with the scouts & Ruby, Tosh, & I are tryingto take advantage of weather and get Spring work done at home.