Sunday, May 26, 2013

Friends who lay together, stay together

Finally, we had a few days to get up to the castle. Our goal was to work on the wine racks for the wine room/fungeon. Andy was up late the night before we left making form work that would make our work easier. Maria and Dave were back for more fun too. Since everyone is asking for more pictures I have a bunch and they are in the order of us getting there and seeing all the progress since we were last there. Brian and Marc, Jerry the Plumber, and the Electrician have been busy as you will see.
This is Rex's room on the fourth floor. As you can see, it is almost all paneled in and looks awesome! 

 This is Rex's bathroom. Straight ahead is where the toliet will be, the shower is to the left.

 This is the view as you come up the stairs on the fourth floor. There is a short hallway with paneling on both sides. The laundry will be directly ahead. Rex's room to the right, Ruby's room to the left.

Ruby's room is a storage area right now.
 
This is the turret bathroom on 2nd floor getting ready for flooring.

Lots of infloor heating tubes

the grand stair looking down  and looking up
                                                           
                                        Lots of lumber in the game room/tool room right now.
The Corona's backdoor stained glass looked awesome in the afternoon light
                                                  
My sweet cousin, Nancy came over and cleaned up a bit for us and she left some nice wild flowers on picnic table for us.
Still have a few palettes of stone to use

The lions remain on guard
                                                 
                                
                                 Andy talking with Brain and Marc on what is in store for the summer
 
 This piece Andy found at an antique store looks so good above the grand stair
 

Now we have to get to work. These are the form works andy built that we will be using to put brick around and create the wine cellar.

                                                           
              Andy and Rex put a bed together. Andy designed them, Matteo Bartolotta made them. Same bed in every room, but each will have a different color drapery that encloses it.
 Rex is holding up a carving that will go where he is holding it. Those were all hand done and are different for each room too.


                                                   
                                     Again we move the pile of bricks. from entry room to fungeon.
                                           

                                  
                                                    Ruby brought her friend from the gym, Abby!
                                    
                    The girls walked to the big rock and did gymnastic poses on it! Thanks for not falling off girls!
The wine room is a buzz with form work, the concrete mixer and workers.
Maria, Dave, and Rex get laying the bricks around the framework.
                                     
                                                 Rex inspects his work. Looks good to me.
                                          
                                             Dave brought his own knee pads, he was ready to work.
                                         
Close up! Andy is going for the sloppy look which is good because none of us had every done this before. The wooden arches will be removed once the morter is set and then we will place wine bottles in the arch, alot of wine bottles!
Mari also came prepared with her working overalls. She was confused at first, but once we told her it was like frosting a cake she was golden.
                                          
Chris the Mason is back and will be putting stones on this wall in the entry. He cleaned the area out to begin.
                                      
 Everyone is busy laying bricks, well Maria and Dave are busy, Rex and Andy seem to just be watching.
Chris preparing rocks to go on wall and his apprentice.

                                                                  A very wet, dirty dog.
Maria frosting the cake in what we now call the "Maria technique"
                                         

 These crazy kids. What good energy they bring with them. Here they are laying the last of the bricks until the next shipment!



                                        Andy are Tosh are tired and dirty and taking a break!
 
                            Our finished product. It is about half done, we ran out of  brick, thank god!

                                                              Sweet Dreams everyone!


Sunday, March 10, 2013

Got Rugs

 Andy was working all morning yesterday, or so he said! He always finds time, in between meetings, to hit an antique show. He says he "just happened to be in the area".

                                                

He came home with a car load of rugs for the castle and had to show us all of them! thank goodness it was a nice day.




 Apparently He also found some other furniture, lamps, and nick knacks, but he got all those on the trailer and over to the storage unit before I saw them. He was saying he loves going to the storage unit to unload things because he sees things he had purchased awhile ago and forgot about.
 

 




Well, he got a great deal on everything and we are one step closer to furnishing the castle, so yeah to Andy and his shopping spree this weekend.




Monday, March 4, 2013

It was a dark and snowy night....

Went up to the castle for 24hrs over the weekend so Andy could meet with the electrician and review the electrical plan with him. We got in Saturday evening and the snow had just started falling and it was so pretty







Some of the stained glass windows are friends made are in and look very pretty at night when they are back lit, as you can see for yourself here. I think this is the Glowacki's Window.





I have always loved this angle from down the hill looking up at the castle, so I braved the deep snow, falling three times to get this picture!

The back door sports another stained glass window, this is the Corona's I believe.

and another angle from the driveway as you enter with the big lions.
I slept in on Sunday, Andy met with the electrician, and we left, so no more pictures this time.



Thursday, February 28, 2013

Floors and Framing







 Andy and Rex went North last weekend to meet with contractors, electrican, heating & water guy, and to see the newly done in floor heating and framing that is done. It was a cold day, but the sun was shining and the driveway was plowed, so all was good. Looking pretty good on the outside.




Here is the Cisterne/Fungeon with the new filled in , in-floor heating slab. We are keep the rough rocks along the edges exposed. When Ed laid the foundation he blasted into this rock to lay the framework and it kinda brings the outside in and reminds us of what use to be.



                                                                                                                                                                                     
This is the tool room right now, but will be other part of the Fungeon. You can see they are framing the ceiling out.

and the new floor in the kitchen!


The great room continues to get framed in and has become the storage area for all the furniture they had to move to do the floors in the other rooms.


The newly created upper floor is the only floor that will have wood floors as seen here,
 The newly created upper floor of bedrooms is framed in and you can see plumbing tubes are in place also.
no people pictures, Rex had the camera this time and he is all about the work speaking for itself. As you can see, even though we haven't been up much, the castle is still bustling with workers. Andy is hoping to meet with the electrician this weekend.